Residents, contractors and developers should be aware of all building permit requirements before alterations, additions or new construction are made to a property.
Click here for a Building Permit Application. Helpful permit installation guidelines are available by expanding the green Permit Application Handouts bar at the bottom of the page.
building permit fees
BUILDING PERMIT TYPE | FEE AMOUNT |
AIR CONDITIONER/FURNACE - RESIDENTIAL | $50.00 |
DECKS, PORCHES, GAZEBOS | $100.00 |
DRIVEWAYS ONLY (ADDITIONAL FEES FOR A WALKWAY/STOOP) | $60.00 |
ELECTRIC SERVICE | $100.00 |
FENCES - RESIDENTIAL | $40.00 |
FENCES - COMMERCIAL/MULTI-FAMILY | $100.00 |
FIREPLACE | $100.00 |
LOW VOLTAGE, VOICE/DATA, COMMERCIAL BURGLAR ALARMS | $100.00 |
PATIOS/WALKWAYS/MISCELLANEOUS FLATWORK | $50.00 |
POOLS - ABOVE GROUND | $100.00 + Electric Fees |
POOLS - IN GROUND | $200.00 + Electric Fees |
RACKING | $200.00 |
RESIDENTIAL CHICKEN KEEPING | $50.00 |
ROOFS - RESIDENTIAL | $40.00 |
ROOFS - COMMERCIAL/MULTI-FAMILY | $100.00 Per Building |
RPZ - LAWN SPRINKLER BACKFLOW PREVENTION | $75.00 |
SEWER REPAIR | $75.00 |
SHEDS | $40.00 |
WATER HEATERS | $50.00 |
WATER LINE REPAIR | $75.00 |
RE-INSPECTION FEES (NOT READY FOR INSPECTION) | $100.00 |
TEMPORARY OCCUPANCY FEES - RESIDENTIAL | $75.00 |
TEMPORARY OCCUPANCY FEES - COMMERCIAL | $150.00 |
For a comprehensive list of building permit fees not listed above, click here: Village Code section 3-1A-3: Fee Schedule, Ordinance 2019-53
residential chicken keeping pilot programThe Woodridge Residential Chicken Keeping Pilot Program will run from April 5, 2024, until October 5, 2025. There is no maximum number of participants or deadline to participate in the pilot program. An inspection of the coop is required before chickens may occupy the space. Prior to expiration of the pilot program, the Village Board will determine if keeping chickens will continue to be allowed in the Village. If the program is continued, permittees would be required to register annually. There would be an annual inspection, and a fee of $50. New coop permits would continue to be granted. If the pilot program is not continued, no additional chicken keeping permits would be granted, and existing permittees would be required to remove all chickens, coops, and associated items from their properties within an established timeframe. During the initial pilot program, permit holders are subject to the regulations listed herein. Any coop that is issued three or more code violations will be required to be removed and will not be allowed to continue in the program.
Click here to fill out a Residential Chicken Keeping Pilot Program Application
All submittal items must be included in one package and must be delivered in person the the Community Development Department located on the first floor of Village Hall at 5 Plaza Drive.
SUPPLEMENTAL HANDOUTS providing installation guidelinesThe permit application handouts in the green drop down below provide supplemental information for each type of project that requires a permit with the Village along with a building permit application at the end of the document. Type a key word, such as deck, shed, fence, etc., in the search box or click on the green "Permit Application Handouts" bar to expand the comprehensive list of permit categories.
Document Center
The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.
Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by HEADER in Ascending Order within category
Documents sorted by HEADER in Ascending Order within category
Permit Application Handouts28 documents
- Basement
- Commercial Permits
- Contractor Requirements
- Decks, Stairs, Guards
- Driveways
- Electrical Work
- Fences
- Generators
- Lawn Sprinkler Systems
- Low Voltage/ Permanent Furniture
- New Single Family Home
- Pallet Racking
- Patios/Fire Pits
- Permit Fees
- Plumbing
- Residential Aging in Place
- Residential Chicken Keeping Pilot Program
- Residential Remodeling
- Roofing
- Room Additions
- RPZ - Irrigation FAQ
- Sheds
- Signs
- Solar Panels
- Swimming Pools and Hot Tubs
- Temporary Signage
- Water and Sewer Repair
- Water Heaters